Every item comes from an explicit rule over your records: the evidence, the rule that fired, why it matters and the next step. A detected pattern is a reason to investigate, not proof of a specific fault.
Showing 26 of 26 items. Generated 02 Nov 2026, 08:02 UTC from the stored data.
DEMO-03-C1 · Demo Site C — Adyar area (demo)
Next step: Schedule a physical inspection of the connector (contacts, pins, latch, cable strain relief) and repeat the measurement.
DEMO-01-C2 · Demo Site A — Guindy area (demo)
Next step: Schedule a physical inspection of the connector (contacts, pins, latch, cable strain relief) and repeat the measurement.
DEMO-04-C1 · Demo Site D — Velachery area (demo)
Next step: Review the fault codes with the operator and inspect the connector and cable assembly.
DEMO-13-C2 · Demo Site M — Kilpauk area (demo)
Next step: Inspect the connector and compare against the operator's maintenance limits; consider increasing measurement frequency.
DEMO-01-C2 · Demo Site A — Guindy area (demo)
Next step: Inspect the connector and compare against the operator's maintenance limits; consider increasing measurement frequency.
DEMO-03-C1 · Demo Site C — Adyar area (demo)
Next step: Plan a service visit before 03 Nov 2026; record the work on the charger page so EVOLT can check it held.
Likely date07 Nov 202680% range 03 Nov 2026 – 12 Dec 2026
Evidence & status ▾Hide ▴DEMO-01-C2 · Demo Site A — Guindy area (demo)
Next step: Service the connector now, record the work on the charger page, and take a new reading to confirm the fix.
Current level0.492 mΩlimit 0.472 mΩ (default: baseline + 50%)
Evidence & status ▾Hide ▴DEMO-06-C1 · Demo Site F — OMR / Sholinganallur area (demo)
Next step: Keep monitoring; confirm the next measurement uses the same method and conditions.
DEMO-13-C2 · Demo Site M — Kilpauk area (demo)
Next step: Keep monitoring; confirm the next measurement uses the same method and conditions.
DEMO-05-C2 · Demo Site E — Anna Nagar area (demo)
Next step: Keep monitoring; confirm the next measurement uses the same method and conditions.
DEMO-06-C1 · Demo Site F — OMR / Sholinganallur area (demo)
Next step: Keep monitoring; confirm the next measurement uses the same method and conditions.
DEMO-10-C2 · Demo Site J — Vellore central area (demo)
Next step: Review the logged fault codes for a common cause before the next maintenance visit.
DEMO-06-C1 · Demo Site F — OMR / Sholinganallur area (demo)
Next step: Increase measurement frequency to confirm or rule out the trend.
DEMO-05-C2 · Demo Site E — Anna Nagar area (demo)
Next step: Increase measurement frequency to confirm or rule out the trend.
DEMO-06-C1 · Demo Site F — OMR / Sholinganallur area (demo)
Next step: Increase measurement frequency to confirm or rule out the trend.
DEMO-13-C2 · Demo Site M — Kilpauk area (demo)
Next step: Plan a service visit before 14 Nov 2026; record the work on the charger page so EVOLT can check it held.
Likely date18 Nov 202680% range 14 Nov 2026 – 24 Nov 2026
Evidence & status ▾Hide ▴All stations
Next step: Confirm with the data provider whether charging time is in minutes and whether charging power is an average or a peak value.
Affected sessions302 / 100030.2%
Evidence & status ▾Hide ▴Station 1
Next step: Check meter calibration and the data export for this station; correct or exclude the affected sessions and re-import.
Inconsistent sessions6 / 718.5%
Evidence & status ▾Hide ▴Station 11
Next step: Check meter calibration and the data export for this station; correct or exclude the affected sessions and re-import.
Inconsistent sessions3 / 437.0%
Evidence & status ▾Hide ▴Station 12
Next step: Check meter calibration and the data export for this station; correct or exclude the affected sessions and re-import.
Inconsistent sessions3 / 525.8%
Evidence & status ▾Hide ▴Station 3
Next step: Check meter calibration and the data export for this station; correct or exclude the affected sessions and re-import.
Inconsistent sessions3 / 595.1%
Evidence & status ▾Hide ▴Station 8
Next step: Check meter calibration and the data export for this station; correct or exclude the affected sessions and re-import.
Inconsistent sessions3 / 605.0%
Evidence & status ▾Hide ▴5 chargers
Next step: Schedule regular contact-resistance or voltage-drop readings for these chargers, then import them.
Not assessable5of 86 chargers
Evidence & status ▾Hide ▴58 chargers
Next step: Import recent measurements for these chargers before making maintenance decisions about them.
Newest reading16 Jul 2026
Evidence & status ▾Hide ▴10 stations
Next step: Ask the data provider how power loss and power consumed are measured, and exclude these sessions from loss reporting until resolved.
Stations affected10
Evidence & status ▾Hide ▴All stations
Next step: Check the charger-type labels against each charger's nameplate, and check for power limits on chargers labelled Fast.
Average power by type26–26.9 kW
Evidence & status ▾Hide ▴“Marked resolved” records a person’s decision in EVOLT. It does not verify that a charger was repaired: if the data still shows the pattern, the item stays visible under “Marked resolved” and is flagged when its evidence changes.
Workflow
Workflow
Workflow
Workflow
Workflow
Workflow